We need to use your personal data to make your experience better. To comply with the General Data Protection Regulation, we need to ask for your consent before using your personal data.
Paris expo Porte de Versailles
from 02/04/2025 to 03/04/2025Space PAVILION 5.2
Presentation
Limited Period Increase of Power
Limited period increase of power
Need more electrical power? No problem. If the limited period power supply level you ordered (or that your event's organiser supplied) is insufficient, this option will allow you to increase it. It is based on the power supply schedule established by the organiser, and is automatically shut off overnight.
Dates and times of limited period electrical supply :
04/01/2025 : 08.00am - 10.00pm;
04/02/2025 : 08.00am - 07.30pm;
04/03/2025 : 08.00am - 06.30pm.
Dates and times of 24h/24 period electrical supply :
from 04/01/2025 at 01.00pm to 04/03/2025 at 06.30pm.
This option includes:
- Installation and removal of your electrical box
- Energy use during the power supply schedule
- Technical support throughout the event
- In limited period mode, the power will be shut off during the night, according to the schedule established by the event organiser.
- If the limited period power supply level you ordered (or that your event's organiser supplied) is insufficient, this option will allow you to increase it.
16 available offer(s)
-
Limited Period Increase of Power from 8 to 10kW
-
Limited Period Increase of Power from 6 to 8kW
-
Limited Period Increase of Power from 1 to 3kW
-
Limited Period Increase of Power from 4 to 6kW
-
Limited Period Increase of Power from 6 to 10kW
-
Limited Period Increase of Power from 3 to 4kW
-
Limited Period Increase of Power from 4 to 8kW
-
Limited Period Increase of Power from 10 to 20kW
-
Limited Period Increase of Power from 4 to 10kW
-
Limited Period Increase of Power from 8 to 20kW
-
Limited Period Increase of Power from 3 to 6kW
-
Limited Period Increase of Power from 6 to 20kW
-
Limited Period Increase of Power from 3 to 8kW
-
Limited Period Increase of Power from 3 to 10kW
-
Limited Period Increase of Power from 4 to 20kW
-
Limited Period Increase of Power from 3kW to 20kW
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Over 8 kW, a connection to a three-phase P17 32 A outlet that can handle higher power loads is necessary.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
Dates and times of limited period electrical supply :
04/01/2025 : 08.00am - 10.00pm;
04/02/2025 : 08.00am - 07.30pm;
04/03/2025 : 08.00am - 06.30pm.
Dates and times of 24h/24 period electrical supply :
from 04/01/2025 at 01.00pm to 04/03/2025 at 06.30pm.
-
Helpline+33 (0)1 40 68 16 16
-
Proven service providers
-
Secure payment
-
On-site delivery